Bringing new life to a forgotten floor

LCRI transformed the unfinished ground floor of the historic Julius Freyhan Building in St. Francisville, Louisiana. Through detailed and clear planning, the team worked within the limits of the century-old foundation to create conditioned, occupiable space.

LCRI transformed the unfinished ground floor of the historic Julius Freyhan Building in St. Francisville, Louisiana. Through detailed and clear planning, the team worked within the limits of the century-old foundation to create conditioned, occupiable space.

Owner:

Freyhan Foundation


location:

St. Francisville, Louisiana

contract value:

Approximately $1.2 million

project type:

Historic renovation and adaptive reuse

scope:

Full buildout of the previously unoccupied ground floor

construction periode:

February 2026 through September 2026

architect:

Holly and Smith architects


delivery method:

Hard Bid

The floor had to come down before anything could go up

The Julius Freyhan Building stands on the site of the first school in West Feliciana Parish. The landmark was rebuilt following a fire in the early 1900s, and its restoration has continued through multiple phases. A previous project restored the upper floors. LCRI’s work focused on the unfinished ground floor.


This level had originally served as an unconditioned space that elevated the building above the flood line. Creating usable interior space required lowering the floor to gain ceiling height.


Reaching the owner’s preferred eight-foot ceiling would have required excavating two feet below the existing floor. However, the historic brick foundation only allowed the floor to be lowered by one foot. The team also had to reserve space above the finished ceiling for the mechanical, electrical, and plumbing systems, which further reduced the available ceiling height.

Defining constraints before committing to solutions

LCRI evaluated the historic foundation and established a safe excavation depth before construction moved forward. The team explained the achievable ceiling heights to the owner early, giving everyone a clear understanding of what the finished conditions would look like.


First, approximately one foot of material was excavated from the ground floor. Then LCRI installed a new slab at the lower elevation.
That change affected more than the interior. Exterior sidewalks, site grades, doors, and door openings had to be lowered for the new floor level. The property’s sloping terrain added further grading considerations and required the interior and exterior work to be planned together.


Inside, LCRI coordinated the mechanical, electrical, and plumbing infrastructure above the ceiling to preserve as much usable height as the structure allowed. Custom wood windows were also fabricated for the historic openings, accompanied by similarly customized doors.


Direct communication kept the owner informed as the project developed.

A historic lower level brought into service

Finished ceiling heights range from approximately 7 feet 3 inches to 7 feet 11 inches. These dimensions reflect the safe excavation depth established by the existing foundation and what was communicated to the owner before construction.

The completed buildout brings conditioned, functional space to a ground floor that was unfinished throughout the building’s history. The new slab, adjusted grades, lowered entrances, coordinated infrastructure, custom windows, and matching doors all work together as one renovation.

As Byron Law explained near the end of the project, “Everything else turned out really good.”

Project results:

1

One complete ground-floor buildout. Previously unfinished space prepared for active use

One complete ground-floor buildout. Previously unfinished space prepared for active use

$1.2 mln

Approximately $1.2 million of the contract value

Approximately $1.2 million of the contract value

7 months

Construction period from February through September 2026

Construction period from February through September 2026

What this project demonstrates

The Julius Freyhan Building shows the value of identifying construction constraints early and communicating them clearly

The owner entered construction with an accurate understanding of the excavation limit and expected ceiling heights. That clarity gave the project team a reliable basis for coordinating the slab, building systems, exterior grades, entrances, and historic finish details.


For LCRI, the project also represents an important company milestone. The business operated as Law Industries through the end of 2025, and the Julius Freyhan Building became the first completed project presented under the LCRI name.